INERATEC · News
Haltermann Carless and INERATEC sign LOI for planned Normandy renewable fuels project
Published:
English editorial record · proofuel
Key points
- Haltermann Carless and INERATEC signed a letter of intent for a power-and-biomass-to-liquids project in Normandy.
- Haltermann intends to buy bio-e-SAF and bio-e-naphtha for a minimum 10-year period after start-up.
- Commissioning is planned for 2029; from 2031 the project targets approximately 60,000 tonnes of wood residues annually and at least 13,000 tonnes of Fischer-Tropsch products.
Summary
Haltermann Carless and INERATEC signed a letter of intent for a power-and-biomass-to-liquids project in Normandy. Haltermann intends to buy bio-e-SAF and bio-e-naphtha for a minimum 10-year period after start-up. Commissioning is planned for 2029; from 2031 the project targets approximately 60,000 tonnes of wood residues annually and at least 13,000 tonnes of Fischer-Tropsch products. These are planned capacity and purchasing intentions, not operating output or a final investment decision.
Original source title
Haltermann Carless und INERATEC bündeln Kräfte zum Ausbau synthetischer Kraftstoffe
This page provides an editorial summary and links to the original source.
Read the original